Home > Case Studies
Design and build a Wastewater Treatment plant with AOP technology to meet stringent environmental discharge limits for highly toxic pollutants such as effluent Phenols <0.2ppm, Sulphide <0.2ppm, COD<100ppm in a sensitive petrochemical environment where safety compliance is of utmost importance.
Design and build an effective wastewater treatment plant within a fully operational petrochemical plant on Jurong Island that meets stringent discharge requirements while adhering to strict safety compliance.
Stage 1
Plasma-Nano bubble oxidation: Chemical
Stage 2
Multi-Media Filtration (MMF): Bulk separation
Stage 3
Mechanical Vapour: Fine polishing
Stage 4
Ultraviolet Radiation: Sterilisation
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Quis ipsum suspendisse ultrices gravida. Risus commodo viverra maecenas accumsan lacus vel facilisis.
Senior Facilities Manager
Co. Reg. No. 201831895H
8 Admiralty Street, Admirax #04-13/14, Singapore 757438
Email: info@sg-enviro.com
Phone: +65 6877 4370
Follow up on
2026 © SG Enviro Pte Ltd. All rights reserved.