Home > Case Studies
Design and retrofit/upgrade the onsite containerised sewerage treatment plant for a large coastal dormitory housing 12,500 foreign workers to a facility with the capacity to treat 3,750m3/day of wastewater to meet NEA discharge to watercourse requirements. This containerised STP must be designed and built to last for another 10 years until the estimated completion of Changi Terminal 5.
The current containerised STP had many operational issues like overflow of sewerage due to insufficient storage capacity for peak loads, low treatment efficiency and deteriorating conditions of the containers which makes it impossible to operate for another 10years.
A new reinforced concrete STP which will be able to last 10 years till the completion of Changi Terminal 5 that integrates new advanced treatment process that is highly efficient for industrial or municipal wastewater treatment. It is specifically designed to handle fluctuating organic loads and produce high-quality effluent suitable for reuse.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Quis ipsum suspendisse ultrices gravida. Risus commodo viverra maecenas accumsan lacus vel facilisis.
Senior Facilities Manager
Co. Reg. No. 201831895H
8 Admiralty Street, Admirax #04-13/14, Singapore 757438
Email: info@sg-enviro.com
Phone: +65 6877 4370
Follow up on
2026 © SG Enviro Pte Ltd. All rights reserved.