Home > Case Studies
Design and upgrade the on-site containerised sewerage treatment plant for a large coastal dormitory housing 12,500 foreign workers to meet NEA discharge to watercourse requirements. This STP must be designed and built to last for another 10 years until the completion of Changi Terminal 5.
The current containerised STP had many operational issues like overflow of sewerage due to insufficient storage capacity and chockage, low treatment efficiency and deteriorating conditions of the containers which makes it impossible to operate existing plant which is already in unusable condition
A new reinforced concrete sewage treatment plant which will be able to last 10 years till the completion of Changi Terminal 5 that integrates new advanced treatment process that is highly efficient for municipal wastewater treatment. It is specifically designed to handle fluctuating incoming loads and produce high-quality effluent suitable for reuse.
Co. Reg. No. 201831895H
8 Admiralty Street, Admirax #04-13/14, Singapore 757438
Email: info@sg-enviro.com
Phone: +65 6877 4370
Follow up on
2026 © SG Enviro Pte Ltd. All rights reserved.