Skip to main content

Project  : Cyanide detoxification Service
Owner  : PT. UBPE Pongkor, Antam
Location  : Bogor, Indonesia
Treatment Capacity  : 3000 m3/day (150 m3/hr)

Description

Detoxification of Cyanide from Tailing ex Gold Maining

Parameter that must be achieved:

Comply with Indonesia DOE regulatory limits
Cyanide < 0.5 ppm