Project : Drilling Mud Treatment Service
Owner: PT. Chevron Pacific Indonesia
Location : Sumatera, Indonesia
Treatment Capacity : 3@1000 BPD (barrel per day)
Description
Plasma treatment to clean-up contaminant consists at Drilling Mud and Recycle water for process.
Parameter that must be achieved:
Comply with Indonesia DOE regulatory limits
Test Description | Regulatory Limit* | Inlet | Drill Hole Number | ||||
0-0 -45 | S1- 0-85 | S2- 0-47 | S1-0 -65 | ||||
Chemical Oxygen Demand, COD | 200 | 3500 | <5 | 7 | <5 | <5 | |
Oil and Grease | 25 | 150 | <1 | <1 | <1 | <1 | |
Hydrogen Sulfide, H2S | 0.5 | 20 | <0.01 | <0.01 | <0.01 | <0.01 | |
Ammonia, NH3 | 5 | 57 | <0.02 | 0.17 | <0.02 | <0.02 | |
Phenol | 2 | 45 | 0.001 | 0.001 | 0.001 | 0.001 | |
Temperature | 40 | 35 | 34 | 34 | 34 | 34 | |
pH | 6.0-9.0 | 9.5 | 6.23 | 6.11 | 6.13 | 6.2 |